• Opening Time
    00:00~24:00
  • Mail Us
    lichao@leadtechsd.com
Intelligent Closed truck Wash Machine  BY18
Intelligent Closed truck Wash Machine  BY18
Intelligent Closed truck Wash Machine  BY18
Intelligent Closed truck Wash Machine  BY18
Intelligent Closed truck Wash Machine  BY18
Intelligent Closed truck Wash Machine  BY18

Intelligent Closed truck Wash Machine BY18

1.Total Power Winter :158kw(Washing 88kw+dredging return water tank 45kw+Pipe heating 3kw+Air dryer 22kw)

2.Summer:155kw(Washing 88kw+dredging return water tank45kw+Air dryer 22kw)

3.Main Component :  ABB

Specification :

No Item Parameters
1 Dimension L:18M× W:4.5M×H:5M (Inner dimension)
2 Wash Area L:13.5M×W:4.5M×H:5M
3 Regional division Air Dry Area:L4.5M×W:4.5M×H:5M
4 Steel structure main body

Q235B steel column, steel beam, component connecting plate, reinforced sheet metal parts,

national standard rectangular tube

5 Side Flushing Side panel flushing height 1.4M-2.0M
6 Bottom Flushing Slange washing angle of 35-45 °, chassis flushing and sewage recovery device
7 Total Power Winter :158kw(Washing 88kw+dredging return water tank 45kw+Pipe heating 3kw+Air dryer 22kw)
Summer:155kw(Washing 88kw+dredging return water tank45kw+Air dryer 22kw)
8 Control Mode Touch screen, can achieve manual and fully automatic (cleaning time adjustable)
9 Flushing water pump 3Sets:Each Power:25kw,Head:100m,Flow:50m³/h,Tianhai brand pump
10 Dredging water pump 3Set:Each Power:15Kw,Head:55m ,Flow:50m³/h,CNP brand
11 Sensor High sensitivity infrared sensor for reflection
12 Main Component ABB
13 Spray Nozzle

The nozzle is made of 304 stainless steel material, consisting of a nozzle base, a universal head,

and a nozzle, which can be manually adjusted at 360 °

14 Water Pipe Galvanized pipes are used for the side panel water spraying pipeline
15 Pipeline Heat insulation device Biding Waire +insulation cotton
16 Insulation board Top rock wool composite board (100mm)
17 Control System Siemens PLC programmable controller main control cabinet   with touch screen
18 Inlet Water Pipeline Steel pipe connection to water pump
19 High pressure hose Hoses, connectors random
20 Dredging system Flushing area floor and return tank
21 Operation monitoring system Equipment operation times, truck flushing records, and storage for three months
22 Speed restriction board 5 kilometer speed limit sign at the entrance location
23 Driving indicator light Traffic lights, Exit LED yellow and green lights
24 Safety protection pile Length 200mm * width 300mm* heightmm ≥ 1000mm, yellow and black safety warning color
25 Lighting device LED 
26 Rolling shutter door  1set at Exit
27 Truck stopper One set at exit (with anti smashing function)
28 Air dryer area 5.5kw*4sets + air knife 4piece

IFrame