1.Total Power Winter :158kw(Washing 88kw+dredging return water tank 45kw+Pipe heating 3kw+Air dryer 22kw)
2.Summer:155kw(Washing 88kw+dredging return water tank45kw+Air dryer 22kw)
3.Main Component : ABB
1.Total Power Winter :158kw(Washing 88kw+dredging return water tank 45kw+Pipe heating 3kw+Air dryer 22kw)
2.Summer:155kw(Washing 88kw+dredging return water tank45kw+Air dryer 22kw)
3.Main Component : ABB
Specification :
| No | Item | Parameters |
| 1 | Dimension | L:18M× W:4.5M×H:5M (Inner dimension) |
| 2 | Wash Area | L:13.5M×W:4.5M×H:5M |
| 3 | Regional division | Air Dry Area:L4.5M×W:4.5M×H:5M |
| 4 | Steel structure main body |
Q235B steel column, steel beam, component connecting plate, reinforced sheet metal parts, national standard rectangular tube |
| 5 | Side Flushing | Side panel flushing height 1.4M-2.0M |
| 6 | Bottom Flushing | Slange washing angle of 35-45 °, chassis flushing and sewage recovery device |
| 7 | Total Power | Winter :158kw(Washing 88kw+dredging return water tank 45kw+Pipe heating 3kw+Air dryer 22kw) |
| Summer:155kw(Washing 88kw+dredging return water tank45kw+Air dryer 22kw) | ||
| 8 | Control Mode | Touch screen, can achieve manual and fully automatic (cleaning time adjustable) |
| 9 | Flushing water pump | 3Sets:Each Power:25kw,Head:100m,Flow:50m³/h,Tianhai brand pump |
| 10 | Dredging water pump | 3Set:Each Power:15Kw,Head:55m ,Flow:50m³/h,CNP brand |
| 11 | Sensor | High sensitivity infrared sensor for reflection |
| 12 | Main Component | ABB |
| 13 | Spray Nozzle |
The nozzle is made of 304 stainless steel material, consisting of a nozzle base, a universal head, and a nozzle, which can be manually adjusted at 360 ° |
| 14 | Water Pipe | Galvanized pipes are used for the side panel water spraying pipeline |
| 15 | Pipeline Heat insulation device | Biding Waire +insulation cotton |
| 16 | Insulation board | Top rock wool composite board (100mm) |
| 17 | Control System | Siemens PLC programmable controller main control cabinet with touch screen |
| 18 | Inlet Water Pipeline | Steel pipe connection to water pump |
| 19 | High pressure hose | Hoses, connectors random |
| 20 | Dredging system | Flushing area floor and return tank |
| 21 | Operation monitoring system | Equipment operation times, truck flushing records, and storage for three months |
| 22 | Speed restriction board | 5 kilometer speed limit sign at the entrance location |
| 23 | Driving indicator light | Traffic lights, Exit LED yellow and green lights |
| 24 | Safety protection pile | Length 200mm * width 300mm* heightmm ≥ 1000mm, yellow and black safety warning color |
| 25 | Lighting device | LED |
| 26 | Rolling shutter door | 1set at Exit |
| 27 | Truck stopper | One set at exit (with anti smashing function) |
| 28 | Air dryer area | 5.5kw*4sets + air knife 4piece |